We will be performing website maintenance on May 29, 2018 from 8:00PM to 10:00PM, during which time the website will be unavailable.

Oregon Chapter - Projects of the Year 2017

Clackamas County - Pudding River (Whiskey Hill Road) Bridge - 2017 Project of Year - Less than $5 Million - Transportation

Whiskey Hill Road is an arterial connecting OR 99E to the west and the Canby-Marquam Highway to the east. The existing four-span reinforced concrete bridge, built in 1931 was rapidly deteriorating.  The replacement bridge is a four-span structure, approximately 440 feet long, with a deck width of approximately 40 feet. The replacement bridge is located on a new vertical and horizontal roadway alignment that places the bridge just upstream of the old bridge.  The superstructure is supported by three interior single column bents and two abutments.  The interior bents are supported by single 8-foot diameter drilled shafts, 6 foot diameter columns, and 7 foot wide bent caps.


Prime Contractor:  Farline Bridge Inc.
Prime Consultant:  David Evans and Associates, Inc.

Learn more about this project by viewing the project application available in Adobe Acrobat format here or the award presentation slides here


Washington County - Cornelius Pass Road - 2017 Project of Year - $5 Million to Less than $25 Million - Transportation

Text to be edited.


Prime Contractor:  Kerr Contractors Oregon, Inc.
Prime Consultant:  David Evans and Associates, Inc.

Learn more about this project by viewing the project application available in Adobe Acrobat format here or the award presentation slides here


Lane Transit District - Emx West - 2017 Project of Year - More than $75 Million - Transportation

Text to be edited.


Prime Contractor:  Wildish
Prime Consultant:  WSP

Learn more about this project by viewing the project application available in Adobe Acrobat format here or the award presentation slides here


Oregon City - HWY 99E Bluff Waterline Replacement - 2017 Project of Year - Less than $5 Million - Environmental/Water

Text to be edited.


Prime Contractor:  Wildish
Prime Consultant:  Murraysmith

Learn more about this project by viewing the project application available in Adobe Acrobat format here or the award presentation slides here


City of Keizer - Shoreline Drive Storm Drain Repair - 2017 Project of Year - Less than $5 Million - Emergency

Text to be edited.


Prime Contractor:  Armadillo Boring, Inc.
Prime Consultant:  AKS Engineering & Forestry LLC

Learn more about this project by viewing the project application available in Adobe Acrobat format here or the award presentation slides here


City of Salem - Peter Courtney Minto Island Bridge - 2017 Project of Year - $5 Million to Less than $25 Million - Structures

Text to be edited.


Prime Contractor:  Legacy Contracting, Inc.
Prime Consultant:  OBEC Consulting Engineers

Learn more about this project by viewing the project application available in Adobe Acrobat format here or the award presentation slides here



FacebookTwitter 

You have been logged out...

You have been logged out of the system due to inactivity. Please login again.

Loading...